(a) Discuss the problems of transportation on the (i) Niger-Benue waterway (ii) Lagos-Kano railway line (b) Suggest possible solutions to these problems

Assessment: WAEC SSCE - Geography - 1989 (Essay) Subject: Geography

Question 1 Report

(a) Discuss the problems of transportation on the
(i) Niger-Benue waterway
(ii) Lagos-Kano railway line

(b) Suggest possible solutions to these problems

Answer Details

(a) Problems of transportation

(i) The Niger-Benue waterway

  • Seasonal fluctuation in water level: the rivers are shallow and non-navigable to large craft in the dry season, restricting use to a few months.
  • Sand bars, shoals and rapids: obstacles such as rapids near Jebba and shifting sandbanks interrupt continuous navigation.
  • Silting and sediment: heavy deposition reduces depth and needs constant dredging.
  • Floating vegetation: water hyacinth and other weeds clog channels.
  • Delta problem: a maze of distributaries and a shifting mouth make the lower course difficult to keep open.
  • Poor port and handling facilities at river ports, and limited modern craft.

(ii) The Lagos-Kano railway line

  • Narrow (single, narrow-gauge) track: a single line causes delays as trains must wait to pass, and the narrow gauge limits speed and load.
  • Old and worn equipment: ageing locomotives, wagons and track lead to frequent breakdowns and derailments.
  • Slow and infrequent service makes it uncompetitive with road transport.
  • Difficult terrain: crossing rivers, the plateau and valleys required costly bridges and gradients that slow trains.
  • Poor maintenance and inadequate funding of track and rolling stock.
  • Vandalism and theft of rails and fittings, and inadequate feeder links to farms and towns.

(b) Possible solutions

  • Regular dredging of the Niger-Benue and clearing of rapids, sandbars and floating weeds to keep channels open all year.
  • Construction of dams and barrages to regulate flow and raise dry-season water levels.
  • Improve river ports with modern loading, storage and navigational aids (buoys, beacons).
  • Modernise the railway: re-lay to standard gauge, double the track on busy sections and replace worn track.
  • Buy new locomotives and wagons and set up proper maintenance workshops.
  • Provide adequate funding, tighten security against vandalism, and build feeder roads and links to widen the traffic served.

Download The App On Google Playstore

Everything you need to excel in your exams

Green Bridge CBT Mobile App
Personalized AI Learning Chat Assistant
200,000+ Exam Questions Across IGCSE, JAMB, WAEC & NECO
Over 3,900 Lesson Notes
Offline Support - Learn Anytime, Anywhere
Green Bridge Timetable
Literature Summaries & Potential Questions
Track Your Performance & Progress
In-depth Explanations for Comprehensive Learning