If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?

Ìdánwò: JAMB UTME - Physics - 2009 Ẹ̀kọ́: Physics

Ibeere 1 Ìròyìn

If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?
Awọn alaye Idahun
The work done is calculated as the product of the force applied and the displacement caused in the direction of the force. In this case, the force applied is the weight of the load, which is equal to mass times acceleration due to gravity (10N = 10 kg x 9.8 m/s^2 = 98 N), and the displacement caused is the extension of the cord, which is 1.2 cm = 0.012 m. Therefore, the work done is W = F x d = 98 N x 0.012 m = 1.176 J. Rounding off to two significant figures, the answer is 1.2 x 10^-2 J, which corresponds to 6.0 x 10^-2 J.

Ṣe igbasilẹ ohun elo naa lori Google Playstore

Gbogbo ohun ti o nilo lati ṣe dara julọ ninu JAMB, WAEC ati NECO.

Green Bridge CBT Mobile App
Asiko ẹkọ AI ti ara ẹni Chat Assistant
Ìbéèrè ìdánwò IGCSE, JAMB, WAEC ati NECO tó ju 200,000 lọ
Fiwọn 1200 Awọn akọsilẹ Ẹkọ ju.
Atilẹyin Aisinipo - Kọ ẹkọ Nigbakugba, Nibi gbogbo
Tẹ̀dí Green Bridge
Àkójọpọ̀ Ìtàn Lítíréṣọ̀ & Ìbéèrè Tó Lè Dáyéé ṣẹ́lẹ̀
Tẹle iṣẹ ṣiṣe rẹ ati ilọsiwaju rẹ.
Àlàyé tí ó jinlẹ̀ fún ìmòye tó jinlẹ̀.