If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?
Maelezo ya Majibu
The work done is calculated as the product of the force applied and the displacement caused in the direction of the force. In this case, the force applied is the weight of the load, which is equal to mass times acceleration due to gravity (10N = 10 kg x 9.8 m/s^2 = 98 N), and the displacement caused is the extension of the cord, which is 1.2 cm = 0.012 m. Therefore, the work done is W = F x d = 98 N x 0.012 m = 1.176 J. Rounding off to two significant figures, the answer is 1.2 x 10^-2 J, which corresponds to 6.0 x 10^-2 J.

Pakua Programu Kwenye Google Playstore

Kila kitu unachohitaji ili kufaulu katika JAMB, WAEC & NECO.

Green Bridge CBT Mobile App
Msaidizi wa Gumzo wa Kujifunza wa AI Uliobinafsishwa
Maswali ya mtihani zaidi ya 200,000 ya IGCSE, JAMB, WAEC na NECO
Zaidi ya Madaftari ya Masomo 1200
Msaada Nje ya Mtandao - Jifunze Wakati Wowote, Popote Pale
Ratiba ya Daraja la Kijani
Muhtasari wa Fasihi na Maswali Yanayoweza Kutokea
Fuata Utendaji na Maendeleo Yako
Maelezo ya Kina kwa Kujifunza kwa Kina