If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?

Avaliação: JAMB UTME - Physics - 2009 Disciplina: Physics

Pergunta 1 Relatório

If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?
Detalhes da Resposta
The work done is calculated as the product of the force applied and the displacement caused in the direction of the force. In this case, the force applied is the weight of the load, which is equal to mass times acceleration due to gravity (10N = 10 kg x 9.8 m/s^2 = 98 N), and the displacement caused is the extension of the cord, which is 1.2 cm = 0.012 m. Therefore, the work done is W = F x d = 98 N x 0.012 m = 1.176 J. Rounding off to two significant figures, the answer is 1.2 x 10^-2 J, which corresponds to 6.0 x 10^-2 J.

Descarregar a aplicação na Google Play Store

Tudo o que precisas para te destacares no JAMB, WAEC e NECO.

Green Bridge CBT Mobile App
Assistente de Chat de Aprendizagem Personalizada com IA
Mais de 200.000 questões de exame do IGCSE, JAMB, WAEC e NECO
Mais de 1200 Notas de Aula
Suporte Offline - Aprenda a Qualquer Hora, em Qualquer Lugar
Horário da Ponte Verde
Resumos de Literatura & Possíveis Perguntas
Acompanhe o Seu Desempenho e Progresso
Explicações Detalhadas para uma Aprendizagem Abrangente