If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?

Jarabawa: JAMB UTME - Physics - 2009 Darasi: Physics

Tambaya 1 Rahoto

If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?
Bayanin Amsa
The work done is calculated as the product of the force applied and the displacement caused in the direction of the force. In this case, the force applied is the weight of the load, which is equal to mass times acceleration due to gravity (10N = 10 kg x 9.8 m/s^2 = 98 N), and the displacement caused is the extension of the cord, which is 1.2 cm = 0.012 m. Therefore, the work done is W = F x d = 98 N x 0.012 m = 1.176 J. Rounding off to two significant figures, the answer is 1.2 x 10^-2 J, which corresponds to 6.0 x 10^-2 J.

Sauke Manhajar Daga Google Playstore

Duk abin da kake buƙata don yin fice a JAMB, WAEC & NECO.

Green Bridge CBT Mobile App
Keɓantaccen Mataimaki na Tattaunawa na Koyo na AI
Tambayoyin jarrabawa na IGCSE, JAMB, WAEC da NECO fiye da 200,000.
Fiye da Lura-Luran Darussa 1200
Tallafin Wajen Layi - Koyo Kowane Lokaci, Ko'ina
Jadawalin Gadar Kore.
Takaitaccen Bayanin Adabi & Tambayoyin Da Za Su Iya Tashi
Bibiye Ayyukanka da Ci Gaban Ka
Cikakken Bayani don Koyon Fahimta.