If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?

Évaluation: JAMB UTME - Physics - 2009 Matière: Physics

Question 1 Rapport

If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?
Détails de la réponse
The work done is calculated as the product of the force applied and the displacement caused in the direction of the force. In this case, the force applied is the weight of the load, which is equal to mass times acceleration due to gravity (10N = 10 kg x 9.8 m/s^2 = 98 N), and the displacement caused is the extension of the cord, which is 1.2 cm = 0.012 m. Therefore, the work done is W = F x d = 98 N x 0.012 m = 1.176 J. Rounding off to two significant figures, the answer is 1.2 x 10^-2 J, which corresponds to 6.0 x 10^-2 J.

Téléchargez l'application sur Google Play.

Tout ce dont vous avez besoin pour exceller au JAMB, WAEC et NECO.

Green Bridge CBT Mobile App
Assistant de chat d'apprentissage personnalisé par IA
Plus de 200 000 questions d'examen IGCSE, JAMB, WAEC et NECO.
Plus de 1200 notes de cours
Assistance Hors Ligne - Apprenez à Tout Moment, Partout
Horaire du Pont Vert
Résumés littéraires et questions potentielles
Suivez vos performances et votre progression
Explications Approfondies pour un Apprentissage Complet