If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?

Evaluación: JAMB UTME - Physics - 2009 Asignatura: Physics

Pregunta 1 Informe

If a load of mass 10N stretched a cord by 1.2cm, what is the total work done?
Detalles de la respuesta
The work done is calculated as the product of the force applied and the displacement caused in the direction of the force. In this case, the force applied is the weight of the load, which is equal to mass times acceleration due to gravity (10N = 10 kg x 9.8 m/s^2 = 98 N), and the displacement caused is the extension of the cord, which is 1.2 cm = 0.012 m. Therefore, the work done is W = F x d = 98 N x 0.012 m = 1.176 J. Rounding off to two significant figures, the answer is 1.2 x 10^-2 J, which corresponds to 6.0 x 10^-2 J.

Descarga la aplicación en Google Playstore.

Todo lo que necesitas para destacar en JAMB, WAEC y NECO.

Green Bridge CBT Mobile App
Asistente de Chat de Aprendizaje Personalizado con IA
Más de 200.000 preguntas de examen de IGCSE, JAMB, WAEC y NECO.
Más de 1200 notas de lecciones
Soporte sin conexión: Aprende en cualquier momento y lugar.
Horario del Puente Verde
Resúmenes de Literatura y Preguntas Potenciales
Controla tu rendimiento y progreso.
Explicaciones detalladas para un aprendizaje integral