The cost that raises from failure to load or unload a ship at the port within a stipulated period is known as

Assessment: JAMB UTME - Commerce - 1997 Subject: Commerce

Question 1 Report

The cost that raises from failure to load or unload a ship at the port within a stipulated period is known as