A skip on a building site is emptied and refilled several times in a day. It is filled with \(2.4\) tonnes of rubble, then \(1.1\) tonnes are removed for re...

Assessment: Mathematics Specification A 4MA1 | Paper 1 Mock 01 | Written Paper 1 (1F/1H) Subject: Mathematics Specification A - 4MA1

Question 1 Report

A skip on a building site is emptied and refilled several times in a day. It is filled with \(2.4\) tonnes of rubble, then \(1.1\) tonnes are removed for recycling. The skip now holds \(3.6\) tonnes.

  1. Work out the net change in the mass of rubble in the skip. (1)
  2. Find the mass of rubble in the skip before it was filled. (2)

Answer Details

This question tests finding a net change between two decimal quantities and reversing it to find an earlier value.

  1. (a) [1] The skip gains \(2.4\) tonnes and then loses \(1.1\) tonnes, so the net change is \[2.4 - 1.1 = 1.3\] tonnes.
  2. (b) [2] The mass before filling equals the current mass minus the net change: \[3.6 - 1.3 = 2.3\] The skip held \(2.3\) tonnes of rubble before it was filled.

Working with decimals follows exactly the same directed-number reasoning as whole numbers; align the decimal points carefully when subtracting.

Download The App On Google Playstore

Everything you need to excel in your exams

Green Bridge CBT Mobile App
Personalized AI Learning Chat Assistant
200,000+ Exam Questions Across IGCSE, JAMB, WAEC & NECO
Over 3,900 Lesson Notes
Offline Support - Learn Anytime, Anywhere
Green Bridge Timetable
Literature Summaries & Potential Questions
Track Your Performance & Progress
In-depth Explanations for Comprehensive Learning