Nof Furniture is a business making made-to-order desks for home offices. Fig. 1 shows a workshop map used by the production manager. A customer returned a d...

Assessment: Business 4BS1 | Paper 1 Mock 01 | Written Paper 1 Subject: Business - 4BS1

Question 1 Report

Nof Furniture is a business making made-to-order desks for home offices. Fig. 1 shows a workshop map used by the production manager. A customer returned a desk because a drawer stuck and the varnish had scratches. The manager wants every worker to take responsibility for quality, rather than leaving all inspection to one employee at the end. She is considering a total quality management, TQM, approach. The business has cash available, but workers would need time away from production for training. Better quality may help Nof compete in the premium market.

Cut woodmeasure twiceBuild drawerfit check hereVarnish deskcover surfaceTeam quality meeting© EAGLE BEACON GLOBAL

(a) State two quality problems shown in the case study. [2]
(b) Define total quality management, TQM. [3]
(c) Analyse why the fit check shown in Fig. 1 should take place before varnishing. [4]
(d) Calculate the total cost of reworking 15 returned desks if each repair takes 3 hours and labour costs £18 per hour. Show your working. [5]
(e) Assess whether Nof Furniture should introduce TQM. [6]

Answer Details

(a) The drawer sticks or does not open smoothly, and the varnish has scratches or a damaged surface finish. [2]

(b) Total quality management, TQM, is a business-wide approach to quality [1] in which all employees take responsibility for preventing defects [1], using continuous improvement and customer requirements to set standards [1]. [3]

(c) The drawer fit should be checked before varnishing so a poor fit can be corrected before the desk is finished [1]. Repair after varnishing could damage or require removal of the varnish [1]. Early checking reduces wasted materials and labour [1], making it more likely that the desk meets the customer specification first time [1]. [4]

(d) Total labour time:

\[15\times3=45\text{ hours}\]

Reworking cost:

\[45\times£18=£810\]

The total reworking cost is £810. [5]

(e) TQM makes each worker check their own work [1], so faults such as incorrect measurements can be identified early [1]. Team meetings allow staff ideas to improve the process [1], reducing returns and protecting Nof's premium reputation [1]. Training uses cash and takes workers away from producing desks [1]. Nevertheless, Nof should introduce TQM because continuing return costs and lost customers are likely to exceed initial training costs, provided managers give clear quality standards [1]. [6]

Download The App On Google Playstore

Everything you need to excel in your exams

Green Bridge CBT Mobile App
Personalized AI Learning Chat Assistant
200,000+ Exam Questions Across IGCSE, JAMB, WAEC & NECO
Over 3,900 Lesson Notes
Offline Support - Learn Anytime, Anywhere
Green Bridge Timetable
Literature Summaries & Potential Questions
Track Your Performance & Progress
In-depth Explanations for Comprehensive Learning