A car painter charges ₦40.00 per day for himself and ₦10.00 per day for his assistant. if a fleet of cars were painted for ₦2000.00 and the painter worked 1...

Ìdánwò: JAMB UTME - Mathematics - 1990 Ẹ̀kọ́: General Mathematics

Ibeere 1 Ìròyìn

A car painter charges ₦40.00 per day for himself and ₦10.00 per day for his assistant. if a fleet of cars were painted for ₦2000.00 and the painter worked 10days more than his assistant, how much did the assistant receive?
Awọn alaye Idahun
To solve this problem, we can use a system of equations. Let's call the number of days the assistant worked "x". Then the number of days the car painter worked would be "x + 10" (since he worked 10 days more than the assistant). We can then set up the following equations: 40(x+10) + 10x = 2000 (this represents the total amount the car painter and his assistant earned for painting the cars) Simplifying this equation: 50x + 400 = 2000 50x = 1600 x = 32 So the assistant worked for 32 days. To find out how much he earned, we can plug this value back into one of the original equations: 10x = 10(32) = 320 Therefore, the assistant earned ₦320.00.

Ṣe igbasilẹ ohun elo naa lori Google Playstore

Gbogbo ohun ti o nilo lati ṣe dara julọ ninu JAMB, WAEC ati NECO.

Green Bridge CBT Mobile App
Asiko ẹkọ AI ti ara ẹni Chat Assistant
Ìbéèrè ìdánwò IGCSE, JAMB, WAEC ati NECO tó ju 200,000 lọ
Fiwọn 1200 Awọn akọsilẹ Ẹkọ ju.
Atilẹyin Aisinipo - Kọ ẹkọ Nigbakugba, Nibi gbogbo
Tẹ̀dí Green Bridge
Àkójọpọ̀ Ìtàn Lítíréṣọ̀ & Ìbéèrè Tó Lè Dáyéé ṣẹ́lẹ̀
Tẹle iṣẹ ṣiṣe rẹ ati ilọsiwaju rẹ.
Àlàyé tí ó jinlẹ̀ fún ìmòye tó jinlẹ̀.