Total cost is obtain by?

Nyocha: WAEC SSCE - Economics - 2015 (Objective) Ihe Ọmụmụ: Economics

Ajụjụ 1 Ripọtì

Total cost is obtain by?

Akọwa Nkọwa
Total cost is obtained by "adding up the total variable cost and total fixed cost." Total variable cost is the cost that varies with the level of output, such as the cost of raw materials, labor, and energy. Total fixed cost is the cost that remains constant regardless of the level of output, such as rent, insurance, and salaries. To calculate total cost, we add up the total variable cost and total fixed cost. This gives us the total cost of producing a given level of output. Calculating total cost by "adding up the marginal cost at each level" is not correct because marginal cost is the additional cost of producing one more unit of output, and summing up these costs does not give us the total cost of producing all units of output. Similarly, "dividing the total cost of output at each level" and "adding up the average variable cost at each level" are not correct methods for calculating total cost.

Budata Ngwa Ahụ Na Google Playstore

Ihe nile ichoro iji nwee ihe ịga nke ọma na JAMB, WAEC & NECO.

Green Bridge CBT Mobile App
Onye Enyemaka Nkata AI Nke Ọmụmụ Ihe Ahaziri Maka Gị
Ajụjụ ule IGCSE, JAMB, WAEC na NECO karịrị 200,000
Ihe karịrị 1200 Nkọwa Nkuzi
Nkwado Na-enweghị Ịntanetị - Mụọ Ihe Mgbe Ọ Bụla, Ebe Ọ Bụla
Jadawalin Gada Kore
Akọkọ akọle iwe & Ibeere agbara
Sọfụma Ọrụ Gi & Ọganihu Gi
Nkọwa Miri Emi Maka Ọmụmụ Ihe Zuru Ezu