What must be added to variable cost to give total cost?

Ìdánwò: WAEC SSCE - Economics - 2007 (Objective) Ẹ̀kọ́: Economics

Ibeere 1 Ìròyìn

What must be added to variable cost to give total cost?
Awọn alaye Idahun
To obtain the total cost of producing a certain quantity of output, you need to add the fixed cost to the variable cost. Fixed costs are the costs that do not change with the level of output, such as rent, insurance, or salaries. Variable costs, on the other hand, are the costs that vary with the level of output, such as the cost of raw materials, labor, or electricity. Thus, adding the fixed cost to the variable cost will give you the total cost of producing a specific level of output. Therefore, the correct option to choose is "fixed cost" to get the total cost.

Ṣe igbasilẹ ohun elo naa lori Google Playstore

Gbogbo ohun ti o nilo lati ṣe dara julọ ninu JAMB, WAEC ati NECO.

Green Bridge CBT Mobile App
Asiko ẹkọ AI ti ara ẹni Chat Assistant
Ìbéèrè ìdánwò IGCSE, JAMB, WAEC ati NECO tó ju 200,000 lọ
Fiwọn 1200 Awọn akọsilẹ Ẹkọ ju.
Atilẹyin Aisinipo - Kọ ẹkọ Nigbakugba, Nibi gbogbo
Tẹ̀dí Green Bridge
Àkójọpọ̀ Ìtàn Lítíréṣọ̀ & Ìbéèrè Tó Lè Dáyéé ṣẹ́lẹ̀
Tẹle iṣẹ ṣiṣe rẹ ati ilọsiwaju rẹ.
Àlàyé tí ó jinlẹ̀ fún ìmòye tó jinlẹ̀.