The time allowed for unloading and loading ships is referred to as

Ìdánwò: WAEC SSCE - Commerce - 1998 (Objective) Ẹ̀kọ́: Commerce

Ibeere 1 Ìròyìn

The time allowed for unloading and loading ships is referred to as
Awọn alaye Idahun
The time allowed for unloading and loading ships is referred to as "lay days". This term is commonly used in the shipping industry, specifically in the context of chartering ships. Lay days refer to the agreed-upon time period in which the charterer (i.e. the party who has hired the ship) has the right to load and unload cargo on the ship. The lay days are specified in the charter party agreement between the shipowner and the charterer, and the duration can vary depending on the agreement reached. The term "lay days" is used to describe the days when the ship is stationary in port waiting for cargo to be loaded or unloaded.

Ṣe igbasilẹ ohun elo naa lori Google Playstore

Gbogbo ohun ti o nilo lati ṣe dara julọ ninu JAMB, WAEC ati NECO.

Green Bridge CBT Mobile App
Asiko ẹkọ AI ti ara ẹni Chat Assistant
Ìbéèrè ìdánwò IGCSE, JAMB, WAEC ati NECO tó ju 200,000 lọ
Fiwọn 1200 Awọn akọsilẹ Ẹkọ ju.
Atilẹyin Aisinipo - Kọ ẹkọ Nigbakugba, Nibi gbogbo
Tẹ̀dí Green Bridge
Àkójọpọ̀ Ìtàn Lítíréṣọ̀ & Ìbéèrè Tó Lè Dáyéé ṣẹ́lẹ̀
Tẹle iṣẹ ṣiṣe rẹ ati ilọsiwaju rẹ.
Àlàyé tí ó jinlẹ̀ fún ìmòye tó jinlẹ̀.