which of the following is the correct way to calculate total cost?

Ìdánwò: WAEC SSCE - Economics - 1993 (Objective) Ẹ̀kọ́: Economics

Ibeere 1 Ìròyìn

which of the following is the correct way to calculate total cost?
Awọn alaye Idahun
The correct way to calculate total cost is to add the fixed cost and variable cost together. Fixed costs are expenses that do not change with the amount of output, such as rent or salaries, while variable costs are expenses that increase or decrease as the amount of output changes, such as raw materials or labor. Adding the fixed cost to the variable cost gives the total cost of producing a certain amount of output. This is because fixed costs are already incurred and do not change based on the level of output, while variable costs increase or decrease as the level of output changes. Therefore, the correct option is the one that suggests "Addition of fixed cost to variable cost."

Ṣe igbasilẹ ohun elo naa lori Google Playstore

Gbogbo ohun ti o nilo lati ṣe dara julọ ninu JAMB, WAEC ati NECO.

Green Bridge CBT Mobile App
Asiko ẹkọ AI ti ara ẹni Chat Assistant
Ìbéèrè ìdánwò IGCSE, JAMB, WAEC ati NECO tó ju 200,000 lọ
Fiwọn 1200 Awọn akọsilẹ Ẹkọ ju.
Atilẹyin Aisinipo - Kọ ẹkọ Nigbakugba, Nibi gbogbo
Tẹ̀dí Green Bridge
Àkójọpọ̀ Ìtàn Lítíréṣọ̀ & Ìbéèrè Tó Lè Dáyéé ṣẹ́lẹ̀
Tẹle iṣẹ ṣiṣe rẹ ati ilọsiwaju rẹ.
Àlàyé tí ó jinlẹ̀ fún ìmòye tó jinlẹ̀.