The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as

Ìdánwò: JAMB UTME - Commerce - 2016 Ẹ̀kọ́: Commerce

Ibeere 1 Ìròyìn

The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as
Awọn alaye Idahun
The cost incurred as a result of failure to load or unload a ship at the ports within a specified period is referred to as "demurrage charges". Demurrage charges are fees that are charged by shipping companies to the party responsible for delays in loading or unloading a ship at the port beyond the agreed period. These charges are intended to compensate the shipping company for the loss of income that results from the delay. For example, if a ship is supposed to be unloaded within 24 hours but takes 36 hours, the shipping company may charge demurrage fees to the party responsible for the delay. These fees can be quite significant, and they can be a significant expense for companies that rely on timely delivery of goods by ship. Therefore, it is important for companies to be aware of demurrage charges and to ensure that they have adequate plans and resources in place to avoid delays and ensure timely loading and unloading of ships at the ports.

Ṣe igbasilẹ ohun elo naa lori Google Playstore

Gbogbo ohun ti o nilo lati ṣe dara julọ ninu JAMB, WAEC ati NECO.

Green Bridge CBT Mobile App
Asiko ẹkọ AI ti ara ẹni Chat Assistant
Ìbéèrè ìdánwò IGCSE, JAMB, WAEC ati NECO tó ju 200,000 lọ
Fiwọn 1200 Awọn akọsilẹ Ẹkọ ju.
Atilẹyin Aisinipo - Kọ ẹkọ Nigbakugba, Nibi gbogbo
Tẹ̀dí Green Bridge
Àkójọpọ̀ Ìtàn Lítíréṣọ̀ & Ìbéèrè Tó Lè Dáyéé ṣẹ́lẹ̀
Tẹle iṣẹ ṣiṣe rẹ ati ilọsiwaju rẹ.
Àlàyé tí ó jinlẹ̀ fún ìmòye tó jinlẹ̀.