What must be added to variable cost to give total cost?

Avaliação: WAEC SSCE - Economics - 2007 (Objective) Disciplina: Economics

Pergunta 1 Relatório

What must be added to variable cost to give total cost?
Detalhes da Resposta
To obtain the total cost of producing a certain quantity of output, you need to add the fixed cost to the variable cost. Fixed costs are the costs that do not change with the level of output, such as rent, insurance, or salaries. Variable costs, on the other hand, are the costs that vary with the level of output, such as the cost of raw materials, labor, or electricity. Thus, adding the fixed cost to the variable cost will give you the total cost of producing a specific level of output. Therefore, the correct option to choose is "fixed cost" to get the total cost.

Descarregar a aplicação na Google Play Store

Tudo o que precisas para te destacares no JAMB, WAEC e NECO.

Green Bridge CBT Mobile App
Assistente de Chat de Aprendizagem Personalizada com IA
Mais de 200.000 questões de exame do IGCSE, JAMB, WAEC e NECO
Mais de 1200 Notas de Aula
Suporte Offline - Aprenda a Qualquer Hora, em Qualquer Lugar
Horário da Ponte Verde
Resumos de Literatura & Possíveis Perguntas
Acompanhe o Seu Desempenho e Progresso
Explicações Detalhadas para uma Aprendizagem Abrangente