The time allowed for unloading and loading ships is referred to as

Avaliação: WAEC SSCE - Commerce - 1998 (Objective) Disciplina: Commerce

Pergunta 1 Relatório

The time allowed for unloading and loading ships is referred to as
Detalhes da Resposta
The time allowed for unloading and loading ships is referred to as "lay days". This term is commonly used in the shipping industry, specifically in the context of chartering ships. Lay days refer to the agreed-upon time period in which the charterer (i.e. the party who has hired the ship) has the right to load and unload cargo on the ship. The lay days are specified in the charter party agreement between the shipowner and the charterer, and the duration can vary depending on the agreement reached. The term "lay days" is used to describe the days when the ship is stationary in port waiting for cargo to be loaded or unloaded.

Descarregar a aplicação na Google Play Store

Tudo o que precisas para te destacares no JAMB, WAEC e NECO.

Green Bridge CBT Mobile App
Assistente de Chat de Aprendizagem Personalizada com IA
Mais de 200.000 questões de exame do IGCSE, JAMB, WAEC e NECO
Mais de 1200 Notas de Aula
Suporte Offline - Aprenda a Qualquer Hora, em Qualquer Lugar
Horário da Ponte Verde
Resumos de Literatura & Possíveis Perguntas
Acompanhe o Seu Desempenho e Progresso
Explicações Detalhadas para uma Aprendizagem Abrangente