The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as

Nyocha: JAMB UTME - Commerce - 2016 Ihe Ọmụmụ: Commerce

Ajụjụ 1 Ripọtì

The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as
Akọwa Nkọwa
The cost incurred as a result of failure to load or unload a ship at the ports within a specified period is referred to as "demurrage charges". Demurrage charges are fees that are charged by shipping companies to the party responsible for delays in loading or unloading a ship at the port beyond the agreed period. These charges are intended to compensate the shipping company for the loss of income that results from the delay. For example, if a ship is supposed to be unloaded within 24 hours but takes 36 hours, the shipping company may charge demurrage fees to the party responsible for the delay. These fees can be quite significant, and they can be a significant expense for companies that rely on timely delivery of goods by ship. Therefore, it is important for companies to be aware of demurrage charges and to ensure that they have adequate plans and resources in place to avoid delays and ensure timely loading and unloading of ships at the ports.

Budata Ngwa Ahụ Na Google Playstore

Ihe nile ichoro iji nwee ihe ịga nke ọma na JAMB, WAEC & NECO.

Green Bridge CBT Mobile App
Onye Enyemaka Nkata AI Nke Ọmụmụ Ihe Ahaziri Maka Gị
Ajụjụ ule IGCSE, JAMB, WAEC na NECO karịrị 200,000
Ihe karịrị 1200 Nkọwa Nkuzi
Nkwado Na-enweghị Ịntanetị - Mụọ Ihe Mgbe Ọ Bụla, Ebe Ọ Bụla
Jadawalin Gada Kore
Akọkọ akọle iwe & Ibeere agbara
Sọfụma Ọrụ Gi & Ọganihu Gi
Nkọwa Miri Emi Maka Ọmụmụ Ihe Zuru Ezu