Tambaya 1 Rahoto
The image above shows an inverted U-tube with the open end, O of one limb below the level, W of water in the tank, in order that water should begin to flow from the tank it is is necessary that
Duk abin da kake buƙata don yin fice a JAMB, WAEC & NECO.