The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as

Jarabawa: JAMB UTME - Commerce - 2016 Darasi: Commerce

Tambaya 1 Rahoto

The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as
Bayanin Amsa
The cost incurred as a result of failure to load or unload a ship at the ports within a specified period is referred to as "demurrage charges". Demurrage charges are fees that are charged by shipping companies to the party responsible for delays in loading or unloading a ship at the port beyond the agreed period. These charges are intended to compensate the shipping company for the loss of income that results from the delay. For example, if a ship is supposed to be unloaded within 24 hours but takes 36 hours, the shipping company may charge demurrage fees to the party responsible for the delay. These fees can be quite significant, and they can be a significant expense for companies that rely on timely delivery of goods by ship. Therefore, it is important for companies to be aware of demurrage charges and to ensure that they have adequate plans and resources in place to avoid delays and ensure timely loading and unloading of ships at the ports.

Sauke Manhajar Daga Google Playstore

Duk abin da kake buƙata don yin fice a JAMB, WAEC & NECO.

Green Bridge CBT Mobile App
Keɓantaccen Mataimaki na Tattaunawa na Koyo na AI
Tambayoyin jarrabawa na IGCSE, JAMB, WAEC da NECO fiye da 200,000.
Fiye da Lura-Luran Darussa 1200
Tallafin Wajen Layi - Koyo Kowane Lokaci, Ko'ina
Jadawalin Gadar Kore.
Takaitaccen Bayanin Adabi & Tambayoyin Da Za Su Iya Tashi
Bibiye Ayyukanka da Ci Gaban Ka
Cikakken Bayani don Koyon Fahimta.