The time allowed for unloading and loading ships is referred to as

Evaluación: WAEC SSCE - Commerce - 1998 (Objective) Asignatura: Commerce

Pregunta 1 Informe

The time allowed for unloading and loading ships is referred to as
Detalles de la respuesta
The time allowed for unloading and loading ships is referred to as "lay days". This term is commonly used in the shipping industry, specifically in the context of chartering ships. Lay days refer to the agreed-upon time period in which the charterer (i.e. the party who has hired the ship) has the right to load and unload cargo on the ship. The lay days are specified in the charter party agreement between the shipowner and the charterer, and the duration can vary depending on the agreement reached. The term "lay days" is used to describe the days when the ship is stationary in port waiting for cargo to be loaded or unloaded.

Descarga la aplicación en Google Playstore.

Todo lo que necesitas para destacar en JAMB, WAEC y NECO.

Green Bridge CBT Mobile App
Asistente de Chat de Aprendizaje Personalizado con IA
Más de 200.000 preguntas de examen de IGCSE, JAMB, WAEC y NECO.
Más de 1200 notas de lecciones
Soporte sin conexión: Aprende en cualquier momento y lugar.
Horario del Puente Verde
Resúmenes de Literatura y Preguntas Potenciales
Controla tu rendimiento y progreso.
Explicaciones detalladas para un aprendizaje integral