A wedding dress is cut and sewn by one person over several weeks, for one customer, and will never be made again. A car is assembled by hundreds of people who each perform one operation, a thousand times a day, on a vehicle identical to the last one. Both are sewing and bolting things together. Neither could be made the other way round without ruining it: a mass-produced wedding dress is not what the customer wanted, and a handmade car would cost more than a house.

In this lesson you will learn the four methods of production the specification names, job, batch, flow and cell, and, more importantly, when each is the right one. Then you will look at efficiency: what it actually means, how it is measured, and the two techniques the specification asks about by name, just in time stock control and continuous improvement. This is a Business operations topic, which means it sits on Paper 1 only, and it is the part of the course where the extended questions are most often about why this method and not that one.

Ziele

  1. Methods of production:
  2. job
  3. batch
  4. flow
  5. cell.
  6. Efficiency in production:
  7. increasing efficiency.

Mindmap

Dieses Thema ist als Karte dargestellt, damit die Zusammenhange sichtbar werden.

Mindmap in der App offnen

Lektionshinweis

The dressmaker and the car plant are solving different problems. The dressmaker has one customer with an exact and unrepeatable requirement, so the work has to be organised around that one item. The car plant has hundreds of thousands of customers who will accept the same vehicle, so the work can be organised around volume, and the whole point of the arrangement is that no one person has to know how to build a car.

Vollstaendige Lernnotiz in der Green Bridge App

Holen Sie sich die Green Bridge CBT App auf Handy oder Computer fuer die komplette IGCSE-Bibliothek: fruehere Pruefungen, Bewertungsschemata, Mindmaps, Lernkarten und Audiolektionen.

Vollständige Lernnotizen mit Diagrammen
KI-gestützter Lernassistent
Pruefungssimulationen auf Zeit, sofort nach Abgabe bewertet
Verfügbar für Android, Windows, macOS und Linux iOS-App demnachst verfugbar

Unterrichtsbewertung

Herzlichen Glückwunsch zum Abschluss der Lektion über Production Processes. Jetzt, da Sie die wichtigsten Konzepte und Ideen erkundet haben,

Sie werden auf eine Mischung verschiedener Fragetypen stoßen, darunter Multiple-Choice-Fragen, Kurzantwortfragen und Aufsatzfragen. Jede Frage ist sorgfältig ausgearbeitet, um verschiedene Aspekte Ihres Wissens und Ihrer kritischen Denkfähigkeiten zu bewerten.

Nutzen Sie diesen Bewertungsteil als Gelegenheit, Ihr Verständnis des Themas zu festigen und Bereiche zu identifizieren, in denen Sie möglicherweise zusätzlichen Lernbedarf haben.

  1. Which one of the following is an example of flow production? A. A bakery making 200 white loaves then 100 brown B. A bottling plant filling 12,000 identical bottles an hour C. A shipyard building one vessel to order D. A tailor making a suit to a customer's measurements Answer: B
  2. A factory produces 5,400 units a week with 18 production workers. What is its output per worker? A. 30 B. 180 C. 300 D. 540 Answer: C
  3. Which one of the following is a risk of using just in time stock control? A. Less money is tied up in stock B. Less storage space is needed C. One late delivery can stop production completely D. Stock is less likely to spoil Answer: C
  4. Which one of the following best describes cell production? A. Making one item at a time to a customer's own design B. Producing identical items continuously along a line C. Teams each taking responsibility for a complete stage or unit of production D. Making a run of one product then changing over to another Answer: C
  5. Which one of the following best describes continuous improvement? A. Buying new machinery every year B. Making many small permanent improvements, largely suggested by the people doing the work C. Producing without holding any stock D. Replacing workers with machines Answer: B

Bearbeiten Sie diese Fragen in der App

Bearbeiten Sie diese Fragen in der App

Übungsklausuren üben

Möchten Sie Übungsklausuren zu Production Processes üben? Laden Sie die Green Bridge CBT App herunter, um Übungsklausuren und vollständige Prüfungssimulationen zu diesem Thema zu erhalten.

Lade die App im Google Playstore herunter.

Alles, was du brauchst, um in JAMB, WAEC & NECO zu glänzen.

Green Bridge CBT Mobile App
Personalisierter KI-Lern-Chat-Assistent
Über 200.000 Prüfungsfragen für IGCSE, JAMB, WAEC und NECO.
Über 1200 Unterrichtsnotizen
Offline-Unterstützung - Lernen jederzeit und überall
Fahrplan der Grünen Brücke
Literaturzusammenfassungen & Potenzielle Fragen
Verfolgen Sie Ihre Leistung und Ihren Fortschritt
Detaillierte Erklärungen für umfassendes Lernen