which of the following is the correct way to calculate total cost?

Prüfung: WAEC SSCE - Economics - 1993 (Objective) Fach: Economics

Frage 1 Bericht

which of the following is the correct way to calculate total cost?
Antwortdetails
The correct way to calculate total cost is to add the fixed cost and variable cost together. Fixed costs are expenses that do not change with the amount of output, such as rent or salaries, while variable costs are expenses that increase or decrease as the amount of output changes, such as raw materials or labor. Adding the fixed cost to the variable cost gives the total cost of producing a certain amount of output. This is because fixed costs are already incurred and do not change based on the level of output, while variable costs increase or decrease as the level of output changes. Therefore, the correct option is the one that suggests "Addition of fixed cost to variable cost."

Lade die App im Google Playstore herunter.

Alles, was du brauchst, um in JAMB, WAEC & NECO zu glänzen.

Green Bridge CBT Mobile App
Personalisierter KI-Lern-Chat-Assistent
Über 200.000 Prüfungsfragen für IGCSE, JAMB, WAEC und NECO.
Über 1200 Unterrichtsnotizen
Offline-Unterstützung - Lernen jederzeit und überall
Fahrplan der Grünen Brücke
Literaturzusammenfassungen & Potenzielle Fragen
Verfolgen Sie Ihre Leistung und Ihren Fortschritt
Detaillierte Erklärungen für umfassendes Lernen