The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as

Prüfung: JAMB UTME - Commerce - 2016 Fach: Commerce

Frage 1 Bericht

The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as
Antwortdetails
The cost incurred as a result of failure to load or unload a ship at the ports within a specified period is referred to as "demurrage charges". Demurrage charges are fees that are charged by shipping companies to the party responsible for delays in loading or unloading a ship at the port beyond the agreed period. These charges are intended to compensate the shipping company for the loss of income that results from the delay. For example, if a ship is supposed to be unloaded within 24 hours but takes 36 hours, the shipping company may charge demurrage fees to the party responsible for the delay. These fees can be quite significant, and they can be a significant expense for companies that rely on timely delivery of goods by ship. Therefore, it is important for companies to be aware of demurrage charges and to ensure that they have adequate plans and resources in place to avoid delays and ensure timely loading and unloading of ships at the ports.

Lade die App im Google Playstore herunter.

Alles, was du brauchst, um in JAMB, WAEC & NECO zu glänzen.

Green Bridge CBT Mobile App
Personalisierter KI-Lern-Chat-Assistent
Über 200.000 Prüfungsfragen für IGCSE, JAMB, WAEC und NECO.
Über 1200 Unterrichtsnotizen
Offline-Unterstützung - Lernen jederzeit und überall
Fahrplan der Grünen Brücke
Literaturzusammenfassungen & Potenzielle Fragen
Verfolgen Sie Ihre Leistung und Ihren Fortschritt
Detaillierte Erklärungen für umfassendes Lernen